Tenderskhoj
India
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Odisha Construction Of Cc/rcc Rig Foundations, Improvement & Widening Of Existing Road And Various Ancillary Jobs In Location Obkb Of Mahanadi Basin Project In Raipur Village Area Under Basudevpur Tahasil, District, Odisha.
15 Apr 2024
Uttar Pradesh Construction Of Interlocking From The House Of Paikarma Lodhi To The House Of Rajesh Lodhi In Majra Audhania Of Development Block Ramiabehad Gram Panchayat Majhra Poorab. Ramiyabehar.
Estimated Cost :1255800 INR
01 Apr 2024
Jammu & Kashmir Construction Of Safety Fuse In Blasting Operation For Road Work (q3) And Construction Of Gelatin Sp 80 Or 90% In Blasting Operation For Road Work (q3). Qty : 41645
29 Mar 2024
Haryana Manglai , Khuddi , Group Of 2 No. Of Habitations Annual Mtc.works For Water Supply, Na Maintenance Of Roads Removal Of Existing Ipb By Manual Means And Disposal Of Dismantled Material With All Lead And Lift As Per Technical Specification Clause 202.3, Na
Estimated Cost :41243 INR
01 Apr 2024
Maharashtra Construction Of Cement Concrete Road From Gorsai To Sainik Vasahat (odr-126) In Taluka Bhiwandi
Estimated Cost :38083944 INR
05 Apr 2024
Maharashtra Improvement To Zai Bordi-tarapur-parnali-mahim-saphale-pargaon-varai To Nh-8 Road Km. 20/000 To101/100 & Saphale Mandatembhikhodave Mdr-38 Km. 0/000to 9/100.
Estimated Cost :1840000000 INR
04 Apr 2024
Haryana Bharog , Chhajju Majra , Group Of 2 No. Of Habitations Annual Maintenance.works For Water Supply, Na Maintenance Of Roads Removal Of Existing Ipb By Manual Means And Disposal Of Dismantled Material With All Lead And Lift As Per Technical Specification Cla
Estimated Cost :41400 INR
01 Apr 2024
Nagaland Consultancy Services For Preparation Of Detailed Project Report For Development Scheme For Longleng- Longching- Mon- Tizit Section (km 33.248 To Km 177.000) Of National Highway 702 In The State Of Nagaland.
10 Apr 2024
Uttar Pradesh Addition Alteration Of Internal Road Boundary Wall And Fencing Of Malhotra Enclave And Race Road Enclave Under Ge South Cantt
Estimated Cost :2417000 INR
17 Apr 2024
Assam Rfp For Construction Of Balance Work Of The 4-laning Of The Section From Rangagara To Kaliabor Tiniali Of Nh-37 (old) From Km 297+000 To Km 315+315 (18.315 Km), Under Sardp-ne, At The Risk And Cost Of Epc Contractor On Epc Mode
06 Apr 2024