Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Maharashtra Implementation Of Rooftop On Grid Solar Pv System Project Of 1.2 Mwp Capacity At Different Stations And Service Buildings Over Bhusawal Division, Central Railway On Ppa (power Purchase Agreement) Mode, Through Public- Private Partnership (ppp) On Design,
30 May 2024
Kerala General-dismantling And Reinstallation Of 100kw Solar Pv System-dismantling And Reinstallation Of 100kw Solar Pv System In High Court Complex, In Connection With Water Proofing Works-general Electrical Work
Estimated Cost :335277 INR
22 Apr 2024
Kerala Design, Supply, Installation And Commissioning Of 5kwp Grid Connected Spv Power Plant With Battery Backup At Navaikulam Grama Panchayath
30 Apr 2024
Kerala Design, Supply, Installation And Commissioning Of 17kwp Grid Connected Roof Top Spv Power Plants At 7 Buildings Under Mavelikkara - Thekkekkara Gramapanchayath, Alappuzha
30 Apr 2024
Telangana 5s Recertification Of Ntpc Dadri Station By Qcfi
22 Apr 2024
Rajasthan The Work Of Boating (solar Energy/battery Operated) In Front Of Moti Magri Memorial At Fatehsagar Lake.
Estimated Cost :25000000
05 Jun 2024
Kerala Design, Supply, Installation And Commissioning Of 5 Kw Grid Connected Spv Power Plant At Glps Nileshwaram,
30 Apr 2024
Tamilnadu Blowing Of Smoothing Reactors & Loco Radiators, Unloading & Loading Of Batteries & Overhauling Of Rps Of Electric Locomotives For A Period Of Two Years.
10 May 2024
Kerala Implementation Of Roof Top Solar Pv System Of Various Capacities At Various Locations Of thiruvananthapuram Division Of Southern Railway With The Objective Of Generating And supplying Energy To Railway Installations Through Resco Mode.
Estimated Cost :38415520 INR
20 May 2024
Rajasthan Design, Engineering, Supply, Erection, Testing, And Commissioning Including Three (03) Years Comprehensive Operation & Maintenance Of 100 Mw (ac) Solar Power Project At Nawa, Didwana, Rajasthan.
26 Apr 2024