Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Karnataka Supply, Installation And Maintenance Of Solar Energy Solutions – Dc Home Lighting And Livehood, Inverter Or Pcu Based Systems For Livelihood, Home Lighting, Institutes (health, Education Etc) And Other Loads, Solar Pump Solutions For Year 2024-25.
30 Apr 2024
Assam Construction Of G Plus1 At Bop Pattamari In Aor Of 19 Bn Bsf Under Shq Bsf
Providing And Fixing Of 1 Kwp Solar System And Solar Lights

Estimated Cost :220700 INR
29 Apr 2024
Andhra Pradesh Supply Of Single Phase 5 30a Irda Bi Directional Solar Net Meters With Reverse Tender.
09 May 2024
Maharashtra Test-3/t-2316 Supply Ccu With Ps, Temp Sc, T156/24_w_coal Stack Yard Management_chp, T155/24_retrofitting Side Beam Assembly, Test3/t-2315 Work Of Testing Gen Transfo, Repl Of Pump & Allied Work Of D & D Ghps, Bm-iii_t-2086_supply Of Bracing Pipes Fo, Tmi
10 May 2024
Himachal Pradesh Construction Of 1 No 90 Men Barrack Including Electrical Installation Fittings Compound Lighting Cable Laying Lightening Conductor Emergency Lighting Solar Water Heating And Fire Fighting System Etc For 17th Btn For Itbp Reckongpeo Distt Kinnaur Hp Sh Pro
Estimated Cost :391902 INR
29 Apr 2024
Maharashtra Bid For - Installation Commissioning Including At Of Power Plants In Mtnl Mumbai Qty : 1
Estimated Cost :1842216 INR
02 May 2024
Assam Construction Of G Plus 1 At Bop Gachpara In Aor Of 19 Bn Bsf Under Shq Bsf
Providing And Fixing Of 1 Kwp Solar System And Solar Lights

Estimated Cost :220700 INR
29 Apr 2024
Rajasthan Annual Maintenance Contract Of Solar Plant At 09 Locations Under Ge (s) Jaipur
Estimated Cost :1000000 INR
07 May 2024
Madhya Pradesh Work Contract For Aoh Of Tg Set, Lp Turbine Overhaul, Aoh Of Generator And Exciter And Optional Work Of Repairing Of Generator Of 210 Mw Atps Chachai
Estimated Cost :31205470
06 May 2024
Maharashtra Balance Of System Package Including Power Evacuation And Three (03) Years Comprehensive Operation & Maintenance For Cumulative Capacity Of 400 Mw (ac) (msedcl Phase-vii & Phase-ix) Solar Photovoltaic Power Project(s) At Four Different Locations In Maharas
14 May 2024