Tenderskhoj
India
- Industry Machinery
LOCATION SUMMARY DEADLINE
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes De-silting Of Manhole Chamber Up To Depth 6 With The Help Of Bucket, Rope And Long Handle Kassi From Out Side Of Manhole With Manual Labour Including De-watering Of Manhol
Estimated Cost :18750 INR
29 Mar 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes Desilting Of Manhole And Sewerline Including Cost Of Machine , Tools , Fuels And Labour Complete In All Respect 250 Mm I/d / Ward No. 7 Kaithal Town
Estimated Cost :18750 INR
29 Mar 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes Desilting Of Manhole And Sewerline Including Cost Of Machine , Tools , Fuels And Labour Complete In All Respect 250 Mm I/d / Kaithal Town Ward No. 6
Estimated Cost :18750 INR
29 Mar 2024
Tamilnadu Auction Sale Of Property Primary Security - Plant And Machinery: 1. Spray Dryer - 1, Capacity – 100 Kg/hour, Consisting Of Feed Tank With Agitator Systems, Water Balance Tank Suction Line To Feed Pump And Etc. 2. Pre-concentration Filter – 3 Sets, Ss Padd
25 Apr 2024
Tamilnadu Supply Of Mpcb For Compressor Unit, & Heater Unit
Mpcb For Compressor Unit, & Heater Unit, Rated Current 7-10 A, Thermal Release Range 10 - 16 A,class 10, Breaking Capacity 10 Ka, Nos Of Pole 3, Rated Voltage 415 V Ac, As Per Rdso Specification No.r

02 Apr 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes Desilting Of Manhole And Sewerline Including Cost Of Machine , Tools , Fuels And Labour Complete In All Respect 200 Mm I/d / Ward No. 8 Kaithal Town
Estimated Cost :20000 INR
29 Mar 2024
Haryana Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Desilting Of Manholes Desilting Of Manhole And Sewerline Including Cost Of Machine , Tools , Fuels And Labour Complete In All Respect 200 Mm I/d / Kaithal Town Ward No. 4
Estimated Cost :17500 INR
29 Mar 2024
Odisha Supply Of Set Of Maintenance Spares For Kirloskar Electric Air Compressor, Cap:-300 Cfm, Model No.kes 55-75.details As Per Annexure-a [ Warranty Period: 30 Months After The Date Of Delivery ]
08 Apr 2024
Haryana Nigdhu Block: Nilokheri Panchayat: Nigdhu Dist.: Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Rectification Of W/s Leakages Job Work Repair / Disconnection In Sanitary Water Supply Connection To Avoid Mixing Of Contaminated Water Complete In
Estimated Cost :19950 INR
29 Mar 2024
Assam Procurement Of Spares Of Raw Water Ash Pump And Pt Pump By Flowmore Make At Ntpc
08 Apr 2024