Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Telangana Sand Blasting And Painting To Em Parts, Vertical Gates, Hoist Bridges And Hoist Equipment And Rectification Of Electrical Operating System Of Crest Gates Of Manjira Barrage Duly Providing New Elec Control Panels Under Eam Cell-i, Kalabgoor, O And M Divisi
Estimated Cost :14463341 INR
22 Apr 2024
Assam Eia/emp And Sia Studies Including Project Clearances For Dpr For Construction Of (i) Elephant Underpasses Across Elephant Corridors On Rani – Kainadhora Road (5 Km) And (ii) Elevated Road Across Deepor Beel Connecting Swahid Smarak & Rani- Kainadhora Road
27 Apr 2024
Karnataka Composite Work Civil & Electrical Involving Provision Of New Crossing Station At Annechakanahalli At Km 77/940 Between Mandagere & Holenarasipura Stations On Mysuru – Hassan Line. #1 Hubballi Division – Hosapete – Kottur Section Proposed Construction Of T
Estimated Cost :345120491 INR
30 Apr 2024
Uttar Pradesh Provision Of S & T Work In Connection With Construction Of Rob’s In Lieu Of Level Crossing No 28& 50 In Gwl-bhind Section Of Jhansi Division.
Estimated Cost :5211952 INR
06 May 2024
Uttar Pradesh Provision Of Limited Height Subway (lhsw) At L-xing No 144 At Km 478/360 Between Gauribazar-chaurichaura & L-xing No 151 At Km 488/280 Between Sardarnagar-kushmi.#provision Of Train Passing Office Building At Bhatni And Kaptanganj.#provision Of Train Pass
Estimated Cost :105058437 INR
08 May 2024
Uttar Pradesh Mahoba-khajuraho Section Construction Of Rob End-to-end Including Approaches) In Lieu Of Level Crossing No 2 At Km 1296/11-12.
Estimated Cost :375200000 INR
30 Apr 2024
spanspan>-Style="color:black;-Background-color:-#ffb3ba;">r"> Uttar Pradesh spanspan>-Style="color:black;-Background-color:-#ffb3ba;">r">Construction Of Integrated Robs & Rubs For Elimination Of Lc No. 496 And 75 In Agra Area Under Gq-gd Routes, Lc No. 77 In Af-bxn In Agra And <spanspan> Style="color:black; Background-color: #ffb3ba;">r
Estimated Cost :1209638518 INR
spanspan>-Style="color:black;-Background-color:-#ffb3ba;">r">14 May 2024
India Balance Earthwork, Blanketing Work In Embankment And Construction Of Minor Bridges/rubs From Sahebgang To Madhubani In Connection With Construction Of Hajipur-sagauli New Bg Rail Line Project.
Estimated Cost :894841856 INR
06 May 2024
Andhra Pradesh Construction Of Additional Lhs Near Lhs Kk-103 At Km. 403/13-14 Between Dantewada - Kamalur Stations On Kk-ii Line Of Division.
Estimated Cost :21641953 INR
07 May 2024
Andhra Pradesh Koraput -singapur Road Doubling Project: Construction Of 19 Nos Of Tunnels Between Tikiri And Bhalumaska Stations In Connection With Koraput-singapur Road Doubling Project Of Divison, East Coast Railway.
Estimated Cost :8663710540 INR
13 May 2024