Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Tamilnadu Construction Of Subway In Lieu Of Manned Level Crossing No. 20 And 27 At Km.21/000-100 And Km.29/500-600 Respectively In Mv-tvr Section..
Estimated Cost :84523944 INR
13 May 2024
Tamilnadu Construction Of Subway In Lieu Of Manned Level Crossing No.2 And 6 At Km.01/500-600 And Km.5/200-300 Respectively In Villupuram - Puducherry Section.
Estimated Cost :93955839 INR
13 May 2024
Tamilnadu Construction Of Subway In Lieu Of Manned Level Crossing No.198 At Km.265/100-200 In Vm - Tpj Chord Line Section.
Estimated Cost :52815215 INR
13 May 2024
Odisha Proposed Conversion And Rebuilding Of 10 Nos Of Bridges By Micro Tunneling Method And 6 Nos Of Bridges Into Rcc Box Bridges By Cut & Cover Method On Up & Dn Line Line Between Baudpur - Korai Stations Of Khurda Road Division.
Estimated Cost :52371411 INR
10 May 2024
Odisha Proposed Conversion And Rebuilding Of 10 Nos Of Bridges By Micro Tunneling Method And 6 Nos Of Bridges Into Rcc Box Bridges By Cut & Cover Method On Up & Dn Line Between Baitarani Road - Jenapur Station Of Khurda Road Division.
Estimated Cost :51495324 INR
10 May 2024
Uttar Pradesh Modification In 25 Kv Ohe Due To Provision Of New Fob At Jalesar Road And Hathras Station Of Division
10 May 2024
box-culvertspan>span>-Of-Size-2-00-Mtr-Span-1-50-Mtr-Height-1-00-Mtr-Length-Of-M-40-Grade-With-Fitting-Accossories-Between-Km-0-7"> Jammu & Kashmir box-culvertspan>span>-Of-Size-2-00-Mtr-Span-1-50-Mtr-Height-1-00-Mtr-Length-Of-M-40-Grade-With-Fitting-Accossories-Between-Km-0-7">Supply Of Precast box culvertspan>span> Of Size 2 00 Mtr Span 1 50 Mtr Height 1 00 Mtr Length Of M 40 Grade With Fitting Accossories Between Km 0 7
Estimated Cost :13440000 INR
box-culvertspan>span>-Of-Size-2-00-Mtr-Span-1-50-Mtr-Height-1-00-Mtr-Length-Of-M-40-Grade-With-Fitting-Accossories-Between-Km-0-7">19 Apr 2024
India Balance Works Of Launching Of Segments, Construction Of Approach Road & Drainage Of Limited Height Subway In Lieu Of Level Crossing No. 271 At Km 890/27a - 28 (bpl-bina Section), 231 At Km 759/6-8 (bpl-et Section) And 247 At Km 826/22-24 (bpl-et Section)
Estimated Cost :88310720 INR
13 May 2024
Maharashtra Design, Supply, Erection Testing And Commissioning Of 25 Kv, Single Phase, Ac Ohe Works, In Connection With Following Works: (a) Construction Of Rob In Csn-dhi Section Between Location 379/9-10, At Dhule By- Pass (nhai). (b) Construction Of Rob In Csn-dhi
Estimated Cost :5778034 INR
13 May 2024
psc-Slabspan>-At-Br.-No.292-(total-3-Spans)-In-Connection-With-Sanctioned-Works-Of-Churchgate--jalgaon-Section-Total-11-No"> Maharashtra psc-Slabspan>-At-Br.-No.292-(total-3-Spans)-In-Connection-With-Sanctioned-Works-Of-Churchgate--jalgaon-Section-Total-11-No">Ukai Songhad- Jalgaon - Section. Rep. Of Corroded Steel Girders By Precast Rcc/psc Slabspan> At Br. No.292 (total 3 Spans) In Connection With Sanctioned Works Of Churchgate -jalgaon Section Total 11 No
Estimated Cost :7652944 INR
psc-Slabspan>-At-Br.-No.292-(total-3-Spans)-In-Connection-With-Sanctioned-Works-Of-Churchgate--jalgaon-Section-Total-11-No">10 May 2024