Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Delhi Supply Of Electronic Weigh Bridge (q3)
Qty : 2

Estimated Cost :7830000 INR
08 Apr 2024
Bihar Resetting Of Pontoon Bridge After Repair And Supplying Of Necesaary Iron Material And Maintenance Of Pontoon Bridge For Five Consecutive Years I.e 2023-24, 2024-25, 2025-26, 2026-27 & 2027-28 (upto Maintenance Period) Dismentling Of Pontoon Bridge For The
Estimated Cost :165561000 INR
19 Apr 2024
Tamilnadu Construction Of High Level Bridge At Km 16 2 Of Nazareth Eral Road
23 Apr 2024
Bihar Resetting Work Of Pontoon Bridge After Repair And Supplying Of Necessary Iron Material And Maintainance Of Pontoon Bridge For Five Consecutive Years I.e 2023-24, 2024-25, 2025-26 , 2026-27 & 2027-28 Dismentling Of Pontoon Bridge For The Alignment And Stor
Estimated Cost :152594000 INR
19 Apr 2024
Odisha Construction Of Box Culvert At Rd 2663m Of Bargarh Distributary (bramhachari)
Estimated Cost :6038277 INR
10 Apr 2024
Odisha Construction Of H.l. Bridge Over Nver Kharashrota At 3rd On Nh-5 Khanditara Bridge To Faridabad Road In The District Of Under Bsy For The Year 2023-24
Estimated Cost :708000000 INR
09 Apr 2024
Gujarat Construction Of Minor Bridge Proposed At Ch. 0.146 Km To 0.186 Km And Ch. 5.417 Km To 5.457 Km On Pirvad Nani Pindakhai Road, Visavadar. Dist.-.
12 Apr 2024
Gujarat Construction Of Minor Bridge At Ch. 6.558 Km To 6.598 Km On Bhalgam Ghodasan Road, Visavadar, Dist.-.
12 Apr 2024
West Bengal Extra Ordinary Repair Of Ibb Roads In The Stretches Under Ibbr 56 57 62 64 67 68 69 70 75 And Link Roads Total Length 200.05 Km, Culver Repair 236 Nos. And Bridge Painting 10 Nos. In The State Of West Bengal And Assam Along Indo Bangladesh Border. Sh: Ear
03 Apr 2024
Odisha Construction Of H.l. Bridge Over River Kharashrota At 6.00 K.m. On Tandra Barei Road In The District Of Jajpur Under Bsy For The Year 2021-22
Estimated Cost :928000000 INR
09 Apr 2024