Tenderskhoj
India
- Industry Cement
LOCATION SUMMARY DEADLINE
Chhattisgarh Steel Cement Handling At Cstores.
Qty : 1

Estimated Cost :4546338 INR
27 Apr 2024
Telangana Laying, Fixing And Polishing Work Of Italian Marble As Per Architectural Drawings At Ground Floor Western Block Auditorium Entrance And Centre Foyer In Salar Jung Museum (labour Charges Only).
Estimated Cost :1288348 INR
02 May 2024
Assam Supply Of Paint, Rfu, Finishing, Air Drying Brushing / Sprying (q3), Enamel, Synthetic, Exterior (a) Under Coating (b) Finishing Paint (v2) As Per Is 2932 (q3), Ready Mixed Paint, Air Drying, Red Oxide - Zinc Phosphate, Priming As Per Is 12744 (q3) Qty :
29 Apr 2024
Karnataka Supply Of Electric Point Machine
Supply Of Electric Point Machine Non-trailable Type Confirming To Rdso Specification No.irs:s-24/2002 Amendment No.1 Or Latest With Following Further Information: A] 220mm Throw With Interlocking For Operation Ofpoin

13 May 2024
Uttar Pradesh Supply Of Pantograph Type Am-12 Complete With Throttle Valve, Main Spring And Other Accessories Without Servomotor And Foot Insulator, M/s. Sil Ordering Ref. 22110001 For A.c. Loco. With Metalised Carbon Strip As Per Rdso Technical Circular No. Elrs/tc/00
16 May 2024
Bihar Supply Of Sleeving Insulation
Sleeving Insulation-1/2 Inch Dlw Drg. No. 8427194 Pt.no- 18530060. [ Warranty Period: 30 Months After The Date Of Delivery ]

06 May 2024
Jammu & Kashmir Supply Of Enamel, Synthetic, Exterior (a) Under Coating (b) Finishing Paint (v2) As Per Is 2932 (q3) Qty : 1938
19 Apr 2024
Rajasthan Supply Of Tie Coat.
Tie Coat As Per Rdso Specn. No. M&c/pcn/114/14 Or Latest (tie Coat Should Be Water Based As Per The Above Specification). Packaging Should Be In 20 Ltrs Container. Colour Shade-white. [ Warranty Period: 30 Months After The Date O

07 May 2024
Rajasthan Supply Of Two Wheeler Parking Interlocking Block (q3)
Qty : 1

19 Apr 2024
Kerala Ihep – Re-insulation Of Two Numbers Rotor Pole And Assembling The Pole Shoe With The Spare Coil Of 130 Mw Ist Stage Generator.
07 May 2024