Tenderskhoj
India
- Energy, Power and Electrical
LOCATION SUMMARY DEADLINE
Chhattisgarh Supply Of Dart For Converters (q3).
Qty : 12000

18 Apr 2024
Punjab Supply Of Pvc Copper Cable 1 Core Multi Core Circular Sheathed Cable With Rigid Conductor As Per Is 694 (q3) Qty : 500
29 Apr 2024
Karnataka Supply Of 4cx25 Sqmm Ltug Cable 1.1 Kv Grade
Supply Of 4cx16 Sqmm Ltug Cable 1.1 Kv Grade, Pvc Insulated Gi Armoured Cable Confirming To Is:1554 Part-i:1988 Or Latest With Full Specification Regarding; - A) Conductor: -ai. Conductor Complying With I

26 Apr 2024
Bihar Construction Of Prefab Structure Workshop And Technology Lab (g+1) At Govt Iti Ashapur Chauk, Benipur.
Estimated Cost :40471350 INR
17 May 2024
Jharkhand Oil Filtration And Part Repairing Of 02 Transformers Of Barora Area
(a) Oil Filtration And Part Repairing Of 1000kva, 6.6kvkv /550v/440v Lighting Transformer Of Amp Colliery Under Barora Area.(b) Oil Filtration And Part Repairing Of 500kva 11kv /440

29 Apr 2024
Bihar Construction Of Prefab Structure Workshop And Technology Lab (g+1) At Govt Iti Ramnagar, Laheria Sarai.
Estimated Cost :40408646 INR
17 May 2024
Maharashtra Supply Of Modular Electrical Enclosure Switch Board Boxes For Modular Type Accessories (q3). Qty : 400
Estimated Cost :800000 INR
09 May 2024
Jharkhand Repairing Of 6.6kv Crompton Greaves Make 400amps Ocb Switch
Repairing Of 6.6kv Crompton Greaves Make 400amps Ocb Switch Sl No. 45832 Controlling Of 1000 Kva, 6.6kv/440v-550v Transformer At Madhuban Filter Plant Sub-station Under, Amp Colliery Barora

29 Apr 2024
Madhya Pradesh Supply Of Fixed & Mobile Contact Tip Of Arno Starting Contactor(c118)
Fixed & Mobile Contact Tip Of Arno Starting Contactor(c118) As Per S. Rly Drg No Pd Pwp 4twd.ct.001 Note: Material Composition Of Silver Is 90% + -1 & Nickel Is 10% + -1, Instead

25 Apr 2024
Gujarat Supply Of Rf Connectors - Rf 8 Ways Pcb Mount Right-angle Connector (q3), Rf Connectors - Rf 8 Ways Male To Sma Connectors With Cable Assembly (q3) Qty : 12
09 May 2024