Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Maharashtra Supply Of M.s Dummy Plug Size-1 Inch With One Hole
M.s Dummy Plug Size-1 Inch With One Hole Of Diameter 2mm On The Head As Per Sbi Drawing No. Sbi/dl/m/633 Attached For Hhp & Alco Locomotives. [ Warranty Period: 18 Months After The Date Of Delivery

30 Apr 2024
Odisha Execution Of P.way Related Works Viz. 1. Ttr(fs) (1 In 12) - 7 Set At Jsgr, (1 In 8.5)- 1 Set And Ttr (fs) At Bxq - (1 In 12) - 2 Sets, (1 In 8.5) - 2 Sets Under Sse/p.way/rgl And 2. Ttr(fs) (1 In 12)-3 Sets At Bxq, (1 In 8.5)- 8 Sets, Derailing Switch (d
Estimated Cost :4924314 INR
10 May 2024
Odisha Miscellaneous P.way Repair And Maintenance Works In Jsgr-slra(ex) And Jsgr-ib Line Section Under The Jurisdiction Of Sse(p.way)/rgl Of Division.
Estimated Cost :12485939 INR
10 May 2024
Tamilnadu Supply Of Blind Socket Housing
Blind Socket Housing For Inter Vehicular Coupler 500a, 750v, 3 Phase, 50 Hz For Lhb Type Coaches Confirming To Rdso Specification No. Rdso/pe/spec/ac/0177-2013 (rev.0) With Rcf Drawing No. Lw71341,alt.b Or Latest. Supp

24 Apr 2024
Haryana Supply Of Fdy Pig Iron Grade Pgsi4mn3p44 Qty : 24
04 May 2024
Assam Supply Of Emergency Brake Accelerator Eb3 S/l With Bracket For Lhb Excise Duty -- Coaches. Part No:- M/s Knorr Bremse Part No. I 89368 As Per Drg.no. Part No:- M/s Knorr Bremse Part No. I 89368 Specn: Part No:- M/s Knorr Bremse Part No. I 89368
Emer

29 Apr 2024
West Bengal Consultancy For Preparation Of Structural Design Soil Investigation Topographical Survey Estimate Abstract Yardstick For Provn Of Otm Accn For Inf Bn At Tamulpur Phi Of Two Phs. Qty : 1
19 Apr 2024
-"must-Change-Kit-For-6th-Year-Maintenance-Schedule-Of-Knorr-Make---Lhb-Power-Car"> Assam -"must-Change-Kit-For-6th-Year-Maintenance-Schedule-Of-Knorr-Make---Lhb-Power-Car">Supply Of "must Change Kit For 6th Year Maintenance Schedule Of Knorr Make - Lhb Power Car Coaches - Brake Cylinder Caliper Overhauling Kit As Per Annexure -b (kit-4)".
"must Change Kit For 6th Year Maintenance Schedule Of Knorr Make - Lhb Power Car

-"must-Change-Kit-For-6th-Year-Maintenance-Schedule-Of-Knorr-Make---Lhb-Power-Car">29 Apr 2024
Karnataka Supply Of Hammer Box Complete And Accessories
Set Of Hammer Box Complete And Accessories (item Description & Qty) As Follows:- 1) Hammer Boxcomplete As Per Rcf Drawing No. Cc64333, Alt'a' :- Qty- 90 Nos 2) Hammer For Breaking Window Glass In Case Of

25 Apr 2024
Andhra Pradesh Supply Of Protective Cover For Passenger Emergency Alarm Pull Box For Lhb Coaches
Protective Cover For Passenger Emergency Alarm Pull Box For Lhb Coaches As Per Drg.no: Rdso/cg/drg/23003 Or Latest [ Warranty Period: 30 Months After The Date Of Deliv

29 Apr 2024