Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Rajasthan Consultancy Services For Preparation Of Detailed Project Report For Construction Of Elevated Structure/bypass In Kherwara Town In Udaipur District And Interchange At Km 72.135 Of Nh-754a On Kalusar-eta Road In Sriganganagar District In The State Of Rajast
06 May 2024
Tamilnadu Construction Of Subway In Lieu Of Manned Level Crossing No.185 And 187b At Km. Km.242/100-200 And Km.245/600-700 Respectively In Vm-tpj (chord Line) Section.
Estimated Cost :125388363 INR
27 May 2024
West Bengal Construction Of Major Rcc Bridges In East Midnapore, West Bengal (pkg-2)
Estimated Cost :227833340 INR
30 Apr 2024
Bihar Design And Construction Of Twin Tunnel By Shield Tbm, Tunnel By Cut And Cover, Underground Ramp At Mithapur And Three Underground Metro Including Architectural Finishing, Ws, Si And Dw Of Stations Of Phase-i Of Patna Mrts.
31 May 2024
Madhya Pradesh Construction Of Road Over Bridge In Lieu Of Lc No.255 At Km 844 /8-10 Between Nishat Pura - Sukhi Sewania Station In Bpl- Bina Section Of Division On West Central Railway
Estimated Cost :148730289 INR
17 May 2024
Bihar Electrical Work In Connection With At Narkatiaganj- Provision Of 12m Wide Fob With Ramp For Development Of Station Under Amrit Bharat Station Scheme.
Estimated Cost :1347962 INR
16 May 2024
Maharashtra Ohe Modification In Connection With:- 1) Construction Of 5m Wide Fob Connecting East And West Of Prabhadevi/parel Station. 2) Extension Of Curry Road Station Middle Public Fob Towards East Side At Km 5/8-9 For East To West Connectivity To Public. 3) Const
Estimated Cost :69936816 INR
24 May 2024
Bihar Provision Of 12m Wide Foot Over Bridge At Barsoi Under Division.
Estimated Cost :87336453 INR
20 May 2024
West Bengal Provision For Re-girdering Of Bridge No. 80t In Bangaon-petrapole Section Of Sealdah Division.
Estimated Cost :30607599 INR
21 May 2024
Tamilnadu Construction Of Subway In Lieu Of Manned Level Crossing No.190 And 193 At Km.251/300-400 And Km.257/000-100 Respectively In Vm-tpj Chord Line Section.
Estimated Cost :120782324 INR
27 May 2024