Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Delhi Selection Of Developers For Setting Up Of 600 Mw Wind Power Projects Under Tcbc
Rfs For Selection Of Wpd For Setting Up Of 600 Mw Ists Connected Wind Power Projects In India Under Tbcb

Estimated Cost :35000000000 INR
12 Jun 2024
Uttar Pradesh Balance Of System Package Of Ists-connected Wind Energy Project With Nominal Capacity 1000 Mw At Solapur In Maharashtra.
09 May 2024
Assam Setting Up Solar Power Project(s) Up To 200 Mw Capacity In The State Of Assam.
10 May 2024
Karnataka Provision Of 2 Nos X 5 Kva Ground Based Off Grid Solar Plants With Battery Backup At Crz & Kgih Railway Stations Over Hubballi Division
Estimated Cost :1248430 INR
14 May 2024
West Bengal Enhancing Capacity To Design And Implement Energy Sector Projects - International Power Distribution Specialist (west Bengal) (53279-001).
25 Apr 2024
Rajasthan Provision Of 800 Kwp Grid Connected Roof Top Solar Power Plants For Railway Stations Including Station Buildings & Integrated Solar Roof Type Platform Shelters.
Estimated Cost :38870803 INR
13 May 2024
Haryana Rfs (request For Selection) Of Solar Power Developers For Setting Up Of 223 Mw Ists-connected Solar Pv Power Projects In India Through Tariff-based Competitive Bidding Under Scheme For Flexibility In Generation And Scheduling Of Thermal/ Hydro Power Stati
13 May 2024
Delhi For Selection Of Solar Power Developers For Setting Up Of 223 Mw Ists-connected Solar (pv) Power Project(s) In India Trough Tariff-based Competitive Bidding (tbcb) Process Under Scheme For Flexibilty In Generation Scheduling Of Thermal/hydro Power Station
13 May 2024
Manipur Provision Of Shifting Of Solar Power Plants Of Capacity 02x30 Kwp From Cob T/akupta And Cob Khurkhul To Bn Jwalamukhi, Hq Igar (e).
09 May 2024
Gujarat Supply, Erection, Testing & Commissioning Of 6.3 Mw (max.) Capacity Wind Power Plant Along With All Accessories & Power Evacuation Facilities & Operation & Maintenance Of Entire Wind Power Plant Up To 10 Years Operation & Maintenance (work No.1).
Estimated Cost :688300000 INR
26 Apr 2024