Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Uttar Pradesh Modification In 25 Kv Ohe Due To Provision Of New Fob At Jalesar Road And Hathras Station Of Division
10 May 2024
box-culvertspan>span>-Of-Size-2-00-Mtr-Span-1-50-Mtr-Height-1-00-Mtr-Length-Of-M-40-Grade-With-Fitting-Accossories-Between-Km-0-7"> Jammu & Kashmir box-culvertspan>span>-Of-Size-2-00-Mtr-Span-1-50-Mtr-Height-1-00-Mtr-Length-Of-M-40-Grade-With-Fitting-Accossories-Between-Km-0-7">Supply Of Precast box culvertspan>span> Of Size 2 00 Mtr Span 1 50 Mtr Height 1 00 Mtr Length Of M 40 Grade With Fitting Accossories Between Km 0 7
Estimated Cost :13440000 INR
box-culvertspan>span>-Of-Size-2-00-Mtr-Span-1-50-Mtr-Height-1-00-Mtr-Length-Of-M-40-Grade-With-Fitting-Accossories-Between-Km-0-7">19 Apr 2024
India Balance Works Of Launching Of Segments, Construction Of Approach Road & Drainage Of Limited Height Subway In Lieu Of Level Crossing No. 271 At Km 890/27a - 28 (bpl-bina Section), 231 At Km 759/6-8 (bpl-et Section) And 247 At Km 826/22-24 (bpl-et Section)
Estimated Cost :88310720 INR
13 May 2024
Maharashtra Design, Supply, Erection Testing And Commissioning Of 25 Kv, Single Phase, Ac Ohe Works, In Connection With Following Works: (a) Construction Of Rob In Csn-dhi Section Between Location 379/9-10, At Dhule By- Pass (nhai). (b) Construction Of Rob In Csn-dhi
Estimated Cost :5778034 INR
13 May 2024
psc-Slabspan>-At-Br.-No.292-(total-3-Spans)-In-Connection-With-Sanctioned-Works-Of-Churchgate--jalgaon-Section-Total-11-No"> Maharashtra psc-Slabspan>-At-Br.-No.292-(total-3-Spans)-In-Connection-With-Sanctioned-Works-Of-Churchgate--jalgaon-Section-Total-11-No">Ukai Songhad- Jalgaon - Section. Rep. Of Corroded Steel Girders By Precast Rcc/psc Slabspan> At Br. No.292 (total 3 Spans) In Connection With Sanctioned Works Of Churchgate -jalgaon Section Total 11 No
Estimated Cost :7652944 INR
psc-Slabspan>-At-Br.-No.292-(total-3-Spans)-In-Connection-With-Sanctioned-Works-Of-Churchgate--jalgaon-Section-Total-11-No">10 May 2024
Delhi Maintenance Of Various Colonies Under Nazul A/c-ii Dwarka Zone
Desilting Of Drain Of Dwarka Flyover Under Jurisdiction Of Project Division 5.

Estimated Cost :2803646 INR
24 Apr 2024
spanspan>-1-X-3.20-M)-Of-bridgespan>-No.32-At-Km-327/5-6,- Punjab spanspan>-1-X-3.20-M)-Of-bridgespan>-No.32-At-Km-327/5-6,-Replacement Of Existing Early Steel Girder (spanspan> 1 X 3.20 M) Of bridgespan> No.32 At Km-327/5-6, spanspan>-1-X-3.20-M)-Of-bridgespan>-No.32-At-Km-327/5-6,-13 May 2024
Delhi Upgradation To 4 Laning Of Barabanki To Ghargra Bridge Start Section Of Nh- 927 From Km 0.000 To 32.800 (existing Chainage Km 1.720 To Km 34.295) In Uttar Pradesh On Ham Mode Under Nh(o) Scheme (package-i).
Estimated Cost :5503500000
28 May 2024
Odisha Construction Of 6 Lane Stand Alone Bridge At Ib River At Kanaktora Jharsuguda Section Of Nh 49 On Epc Mode In The State Of Odisha.
Estimated Cost :735300000
30 May 2024
Uttar Pradesh Construction Of 4 Lane Bridge At Ghagra River With Approaches And Rob From Km. 32.800 To Km. 39.800(existing Chainage Km 34.295 To Km 43.270) Section Of Nh-927 In Uttar Pradesh On Epc Mode Under Nh(o) Scheme (package-ii).
Estimated Cost :3544100000
28 May 2024