Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Delhi Design, Supply, Erection, Testing & Commissioning Of 25 Kv Ac Ohe Modification Work In Connection With Improvement Of Yard And Pre And Post Attention Survey Of Track (longitudinal & Lateral) For Design Mode In The Section Of Aden/jhl.
Estimated Cost :5533399 INR
16 May 2024
West Bengal S & T Work In Connection With 1) Construction Of Lhs In Lieu Of Lc Gate No. 11 A/t In Between Kee-vds In Stn-jaj Section. 2) Closure Of Manned Level Crossing Gate At Lc No.18 C/e By Provision Of Lhs & Lc Gate No.16c/e In Bskh-dumk, Gharmara - Baskinath In
Estimated Cost :5735264 INR
20 May 2024
Jharkhand Supply Of Epoxy Resin & Hardener
Epoxy Resin Lapox (a-83 Or Xy-27) Confirming To Is-12994-1990 As Approved By Rdso, For Manufacturing Of 52/60 Kg Glued Insulated Rail Joints. [ Warranty Period: 30 Months After The Date Of Delivery ]epoxy Hardener La

30 Apr 2024
Jharkhand Supply Of Cards.
Analog Card (azls) For Ssdac, Make-eldyne As Per Rdso Specification No. Rdso/spn/177/2012, Ver.3 Or Latest. Make/brand: Thales Make Via Eldyne. [ Warranty Period: 30 Months After The Date Of Delivery ]digital Card (azls) For Ssdac,

01 May 2024
Telangana Stripping And Fitment Of Air Brake Components Pertains To Icf And Special Stock Coaches, Attention Of Pneumatic Pipe Line Pertains To Suspension Arrangement In Bogies Of Lhb Coaches, Loading, Testing And Unloading Of Dampers, Ioh Schedule Attention Of Bmb
Estimated Cost :26735227 INR
16 May 2024
Telangana Providing Of Manpower Outsourcing Services - Minimum Wage - Highly- Skilled; Admin; Library Restorer Qty : 1
Estimated Cost :453925 INR
04 May 2024
Andhra Pradesh Supplying, Stacking Laying Of Machine Crushed Track Ballast From Railway Approved Quarry, Supply Stacking & Laying Of Permanent Way Materials, Laying And Linking Of Track, Construction Of In - Motion Weigh Bridge Room, Crew Rest Room & Fois Room Etc., For
Estimated Cost :70527774 INR
15 May 2024
Uttar Pradesh Supply And Commissioning Of Two Wheel Drive Power Operated Tractor. [ Warranty Period: 30 Months After The Date Of Delivery ]supply And Commissioning Of Semi Trailer (single Axle) Hydraulic Tractor Trailer Capacity 5 Tonne. [ Warranty Period: 30 Months Af
06 May 2024
West Bengal Supply Of Cut Off Angle Cock With Vent And Reducing Bush.
Cut Off Angle Cock With Vent And Reducing Bush 1-1/4 "wd- 88123-s-01 Alt-2,it-1 To 13 & Reducing Bush 1-1/4" To Icf Drg No.emu/m-3-5-053,alt-n/17,item-7, Spec. No.02-abr-02 Appendix-d [ Warra

03 May 2024
West Bengal Supply Of Reducing Bush 32 X 25 Bore And G.i. Reducing Socket Size 40 Mm. X 25 Mm Etc.
Reducing Bush 32 X 25 Bore, Mat .& Spec: Is: 1239(pt-2)92,tab-27, Aisi 304 Threads As Per Iso-7/1 [ Warranty Period: 30 Months After The Date Of Delivery ]g.i. Re

07 May 2024