Tenderskhoj
Bulgaria
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Bulgaria Services For Carrying Out Activities By Industrial Rope Access Or Alpine Method (repair-restoration And Inspection And Assessment Of Condition) Of Facilities Related To Hydropower Plants/pvpps, Dams And Their Adjacent Hts Facilities, And Preparation Of Te
28 May 2024
Bulgaria Design, Supply, Installation And Commissioning Of Photovoltaic Plants For Self-consumption Of Er South Buildings On The Territory Of Elektrorazpradelenie South Ead
27 May 2024
Bulgaria Construction Of A Photovoltaic Power Plant For Own Needs With A Total Capacity Of 550 Kwp, On The Roofs Of Three Existing Buildings, Located In Pi 10135.2555.26, Varna, St. Studentska No. 1
08 May 2024
Bulgaria Modernization Of The Educational Environment In Brezitsa Kindergarten - Breznik In Three Distinct Positions.
07 May 2024
Bulgaria Construction Of Photovoltaic Installations For The Production And Storage Of Electrical Energy And Improvement Of Energy Efficiency, By Replacing The Joinery Of Educational Institutions And A Municipal Building On The Territory Of The Municipality Of Kubr
09 May 2024
Bulgaria Construction Of A Photovoltaic Power Plant For Own Needs With A Total Capacity Of 550 Kwp, On The Roofs Of Three Existing Buildings, Located In Pi 10135.2555.26, Varna, St. Studentska No. 1
29 Apr 2024
Bulgaria "construction Of A Photovoltaic Power Plant For Own Needs With A Total Capacity Of 550 Kwp, On The Roofs Of Three Existing Buildings, Located In Pi 10135.2555.26, Varna, St. "studentska" No. 1"
29 Apr 2024
Bulgaria "updation Of The Investment Project Of The Sub-object "external Heat Pipe From The Water-ground Facility To The Geothermal Plant In The City Of Zlatograd" From The Object "construction Of A Geothermal Heating System In The City Of Zlatograd" According To
29 Apr 2024
Bulgaria Aim To Facilitate 1,425 Mw Of Renewable Energy Generation Capacity Coupled With 350 Mw Of Energy Storage.
12 Jun 2024
Showing : 9