Tenderskhoj
Bangladesh
- Infrastructure Airports
LOCATION SUMMARY DEADLINE
Bangladesh Renovation Of Domestic New Arrival Belt Area, Avsec Control Room In/c. Other Allied Works At Hsia, Kurmitola, Dhaka.
Estimated Cost :210000 BDT
23 Apr 2024
Bangladesh O & M Of E/m Works At Hazrat Shahjalal International Airport, Kurmitola, Dhaka During The 2023-2024 ( Providing & Replacement Of Local Made Bumper Rubber For Tilted Carousel Row A & B At Hsia)
Estimated Cost :50000 BDT
09 Apr 2024
Bangladesh O & M Of Hazrat Shahjalal International Airport, Kurmitola, Dhaka During The Year 2023-2024 (s:h:-repair And Maintenance Of Pavement Surface Under Boarding Bridge Holding Lounge No. 04 To 11 In/c. Driveway Side And Road Marking Works Etc. Including Other
Estimated Cost :210000 BDT
22 Apr 2024
Bangladesh O & M Of Hazrat Shahjalal International Airport, Kurmitola, Dhaka During The Year 2023-2024 (s:h:-renovation Of Investigation Room Under South Side Stair Of Passenger Terminal Building-1 In/c. Other Necessary Works) At Hsia, Kurmitola, Dhaka.
Estimated Cost :50000 BDT
22 Apr 2024
Bangladesh O & M Of Hazrat Shahjalal International Airport Kurmitola, Dhaka During The Year 2023-2024 (s:h:-any Other Runway, Taxiway, Apron And Airside Related Works-installation Sanitary Fixtures, Stair Railing & Cc Road Gp 03,04,06 &12 Khilkhet Gate No. 02 With O
Estimated Cost :17000 BDT
18 Apr 2024
Bangladesh O & M Of Hazrat Shahjalal International Airport, Kurmitola, Dhaka During The Year 2023-2024 (s:h:-emergency Replacement Of Marble Stone At Bb-4 To 11, Holding Lounge And Corridor Area In/c. Other Associated Works) At Hsia, Kurmitola Dhaka.
Estimated Cost :55000 BDT
18 Apr 2024
Bangladesh O & M Of Hazrat Shahjalal International Airport Kurmitola, Dhaka During The Year 2022-2023 ( S. H: Repair And Maintenance Of Aluminum Composite Panel Infront Of Cip Gate In/c. Other Associated Works) At Hsia, Kurmitola, Dhaka
Estimated Cost :26000 BDT
18 Apr 2024
Bangladesh E/m Renovation Of Vip Lounge Dolonchapa And Rajonigandha Due To Civil Interior Design In/c. Other Works At Hsia .
Estimated Cost :220000 BDT
02 Apr 2024
Bangladesh O & M Of Passenger Terminal Building At Hsia Dhaka During The Year 2023-2024(s.h: Supply Of Special Type Motorized Drum For Domestic Departure Conveyor Belt At Hsia )
Estimated Cost :50000 BDT
28 Mar 2024
Showing : 9