Government Tenders in Bihar | Bihar Govt Road Tenders
Bihar government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Bihar Resetting Of Pontoon Bridge After Repair And Supplying Of Necesaary Iron Material And Maintenance Of Pontoon Bridge For Five Consecutive Years I.e 2023-24, 2024-25, 2025-26, 2026-27 & 2027-28 (upto Maintenance Period) Dismentling Of Pontoon Bridge For The
Estimated Cost :165561000 INR
19 Apr 2024
Bihar Resetting Work Of Pontoon Bridge After Repair And Supplying Of Necessary Iron Material And Maintainance Of Pontoon Bridge For Five Consecutive Years I.e 2023-24, 2024-25, 2025-26 , 2026-27 & 2027-28 Dismentling Of Pontoon Bridge For The Alignment And Stor
Estimated Cost :152594000 INR
19 Apr 2024
Bihar Construction Of High Level Rcc Bridge (3x14.50m) In 10th Km Of Ujjan-ghanshyampur Road In The District Of
Estimated Cost :86282000 INR
02 Apr 2024
Bihar Provision Of High Level Platform (up Pf) At Karahiya Station Under Aden / Bxr.
Provision Of High Level Platform (dn Pf) At Karahiya Station Under Aden/bxr.
Provision Of 3.00 Meter Wide Fob With Ramp For Divyangjan At Karahiya Station Under Ade

Estimated Cost :3584493 INR
12 Apr 2024
Bihar Construction Of High Level Rcc Bridge (3x14.50m) In 10th Km Of Ujjan-ghanshyampur Road.
Estimated Cost :86282000 INR
30 Mar 2024
Bihar Selection Of Construction Supervision & Quality Control (cs&qc) For Different Project:- A) Development Of Bakarganj Nala, Buidco, Patna. B) Development Of Crematorium At Bans Ghat, Buidco, Patna. C) Development Of Multi Level Car Parking Maurya Lok Comple
18 Apr 2024
Bihar Construction And Maintenance Of Roads (a) / Bridges (b).
Construction Of Rcc Bridge Span 3x18.75m At Ch-1+080 Km Over Sahariya Kas Bandh To Kundi Rani Baisa Govindpur With Approach Road = 89.13m.
Construction Of Rcc Bridge In Santhal Piryakar

Estimated Cost :138152000 INR
22 Apr 2024
Bihar Earth Work In Cutting, Filling, Compaction, Blanketing, Turfing, Minor Bridges, Lhs (limited Height Subways), Fob And Others Associated Works In Connection With Construction Of Balance Work Of Gomoh Fly Over.
Estimated Cost :1625819438 INR
12 Apr 2024
Bihar Construction Of High Level Rcc Bridge (3x14.50m) In 10th Km Of Ujjan-ghanshyampur Road In The District Of
Estimated Cost :86282000 INR
28 Mar 2024
Bihar Consultancy services for Authority Engineer for supervision of Construction of 6 lane H.L./Extra-dosed Cable Bridge on river Ganga parallel to western side of Digha-Sonepur Rail-cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar
02 Apr 2024